Hassan II Grand Stadium — ATOMAS engineering studies

Engineering that stands behind its signature

Moroccan engineering design office founded in 2015 — 120 engineers and technicians, from the Hassan II Grand Stadium to the stations of the Kénitra–Marrakech high-speed line.

0
Staff members
0
billion MAD of projects engineered over 5 years
0
Major projects in our portfolio
0
Countries — Morocco · Benin · Uganda

Our fields of activity

Three references that speak for us

Hassan II Grand StadiumPUBLIC FACILITY

Hassan II Grand Stadium

ANEP · 6,000 MDH · delivery 2028

Set to be the world's largest football stadium — 115,000 seats, record-breaking tensile roof. Full multi-disciplinary design and construction supervision.

Benslimane high-speed rail stationRAIL

Benslimane High-Speed Rail Station

ONCF · 2019 – 2025

The Grand Stadium's own station: moucharabieh envelope, structures, MEP and rail systems integration — our dual culture in a single building.

Sèmè City OuidahINTERNATIONAL

Sèmè City University Campus — Benin

Sèmè City · 2,160 MDH · 2022 – 2026

150,000 m² of floor area across 20 packages in Ouidah — full multi-disciplinary design and supervision, entirely modelled in BIM.

See all our references

2015 → 2026, a decade of growth

2015
FoundationEstablished in Rabat
2016-18
Industrial footholdPSA · Danone · OCP · APM
2019
Change of scaleUM6P · Carrousel · High-speed rail
2022
Going internationalBenin · Uganda
2024-25
Flagship projectsGrand Stadium · Hilton Cotonou
2026
ConsolidationISO 9001 · integrated management

A quality system built around your projects

Calculations we stand behind

Every deliverable carries the visa of a qualified engineer in the relevant discipline — one signature, one accountable person.

Documents kept current

Revision indices and distribution under control: you know at any moment which version is authoritative.

Your standards respected

Eurocodes, Moroccan standards, ONCF, OCP, Marriott and Hilton requirements.

Clashes resolved on screen

Coordinated BIM models up to LOD 400 — conflicts are solved before they reach the site.

Our ISO 9001:2015 approach →

A building, infrastructure or industrial project?
Let's talk engineering, schedule and budget.

Contact us