ATOMAS site engineering expertise

Our expertise

Out-of-the-ordinary structures · fast-track delivery · budgets held · dual building-infrastructure culture.

What sets us apart

Exceptional structures

30 m cantilever

BCP Tower · heavy concrete façades at 315 kg/m² · the Grand Stadium's tensile roof.

Delivering fast-track

EXE at site pace

Royal Mansour · American School · UM6P campus under design-build delivery.

Budgets under control

Project + phase

In-house management accounting — drift shows up in hours, not in dirhams.

Buildings + Infrastructure

2 worlds in-house

The high-speed rail stations: a public building sitting on a railway system, delivered by a single team.

Six fields, one single standard of rigour

Multi-disciplinary building designTCE

Buildings — all trades

Stadiums, campuses, luxury hotels, education, residential, offices. Structures, HVAC, power and low-current systems, plumbing and external works, coordinated in BIM from schematic design to detailed design.

InfrastructureOA

Infrastructure

Roads, underpasses, standard and exceptional bridges, high-speed rail stations and structures, urban hydraulics — from definition studies to checking contractors' detailed design.

Industrial facilitiesIND

Industrial

Factories, warehouses, production units, data centers — engineered to the standards of major owners: OCP, PSA, Danone, APM Terminals.

Geotechnics and damsGEO

Geotechnics & dams

Site investigation campaigns and interpretation, special foundations, retaining structures, slope stability and hydraulic works — supporting every division or as a stand-alone assignment.

Abnormal load transport>100 t

Transport & abnormal loads

Route studies for heavy cargo — transformers and turbines of over 100 tonnes: route reconnaissance, checking of bridges under convoy loading, clearance envelopes, port and barge options.

Detailed design and shop drawingsEXE

Detailed design & shop drawings

For EPC and Design & Build projects: detailed construction design, fabrication drawings, schedules and bills of materials — the specialty that keeps fast-track schedules standing.

Full design and construction supervision

Nine phases. One accountable person: the same project manager answers for schedule, budget and engineering, from concept sketch to final acceptance.

ESQConcept design
APSPreliminary design
APDDetailed preliminary design
PROFinal design
DCETender documents
ACTContract award assistance
EXEDetailed design & approvals
DETConstruction supervision
AORAcceptance & handover
Owner's engineerIndependent checking of detailed designAssessment of existing structures

BIM inside the teams, not alongside them

The model is produced by the engineering teams themselves and coordinated by our BIM Managers: modelling, multi-trade coordination, clash detection — up to LOD 400 in the construction phase. On the UM6P Flex Office (1,152 MDH), the model is what drove coordination across all trades.

Your project falls outside the design charts? That's our home ground.

Let's talk